It depends on the work: zoning, construction and right-of-way approvals are three separate things. Each answer below gives the published rule with its source, then what the office decides for your address. We guide you through the permit process. Your written estimate spells out which permits your project needs, who will apply, and what the fees cover.

Inground Pool Removal permits

Cherry Hill’s zoning permit list includes “Demolition of Buildings and Structures”, and New Jersey’s construction code makes it unlawful to demolish a structure without a permit. Source: Cherry Hill Zoning, checked November 29, 2026 and NJ Uniform Construction Code, subchapter 2, checked November 29, 2026.

Ask Zoning and Construction what removal submittal, inspections, utility steps, grading and closeout records apply to your address.

Cost, scope and what to photograph: Inground Pool Removal.

Pool Fill-In permits

Cherry Hill’s grading ordinance requires a permit application for grading or earthwork over 500 square feet on a property not covered by site plan review. Source: Cherry Hill grading ordinance, section 13-3.2, checked November 29, 2026.

The rule is about the area of earthwork, so pool dimensions alone do not decide it. Ask whether a partial fill-in and the proposed fill are accepted for your property, what gets inspected before the hole is covered, and how grading and your plans for the space affect the decision.

Cost, scope and what to photograph: Pool Fill-In.

Above-Ground Pool Removal permits

Cherry Hill’s zoning permit list names “Decks, patios, and pools” and, separately, “Demolition of Buildings and Structures”. It does not say how taking down an above-ground pool is treated. Source: Cherry Hill Zoning, checked November 29, 2026.

Ask the office about removal. Say whether the pool is a movable unit or has fixed features, a hard-wired pump, an attached deck or any excavation.

Cost, scope and what to photograph: Above-Ground Pool Removal.

Garage Demolition permits

Cherry Hill’s zoning permit list includes “Demolition of Buildings and Structures”, and New Jersey’s construction code makes it unlawful to demolish a structure without a permit. Source: Cherry Hill Zoning, checked November 29, 2026 and NJ Uniform Construction Code, subchapter 2, checked November 29, 2026.

Tell the offices whether the garage is detached or attached, which utilities are active, and whether the slab and footings come out. A replacement garage is approved separately.

Cost, scope and what to photograph: Garage Demolition.

Shed Demolition permits

New Jersey’s construction code exempts garden-type utility sheds from the building permit when they are 200 square feet or less, 10 feet or less in height, accessory to a residential building and have no water, gas, oil or sewer connection. Electrical work still needs its own permit. Source: NJ Uniform Construction Code, subchapter 2, checked November 29, 2026 and Cherry Hill Zoning, checked November 29, 2026.

Ask Construction whether that exemption covers removing your shed. Cherry Hill’s zoning permit list also names sheds, so ask Zoning too. Give the footprint, height, use, utility connections and foundation.

Cost, scope and what to photograph: Shed Demolition.

House Demolition permits

Cherry Hill’s residential submittal requirements say a project with complete demolition of a building must include utility release letters, asbestos abatement documentation and the NJ One Call mark-out number. Source: Cherry Hill residential submittal handout, checked November 29, 2026.

That document is written for new one- and two-family homes and additions. Ask Construction for the checklist, notices, inspections and fees that apply to a teardown at your address.

Cost, scope and what to photograph: House Demolition.

Concrete Removal permits

Cherry Hill requires a right-of-way permit for any work in the township right-of-way, and repairing driveway aprons, sidewalks and curbs is named. Source: Cherry Hill Engineering permits, checked November 29, 2026.

A private backyard patio or pool surround is a different case from street work. Tell the office which one you have, and take sidewalk, curb or apron questions to Engineering.

Cost, scope and what to photograph: Concrete Removal.

Deck Removal permits

Cherry Hill’s zoning permit list names “Decks, patios, and pools” and “Demolition of Buildings and Structures”. Source: Cherry Hill Zoning, checked November 29, 2026.

Tell the offices whether the deck is freestanding or attached, how high it stands and whether it is the way out of a door. Describe any deck you plan to rebuild in the same call.

Cost, scope and what to photograph: Deck Removal.

Interior Demolition permits

New Jersey’s construction code requires a permit to alter or reconstruct a building, and it says cutting a load-bearing wall or removing a structural beam is not ordinary maintenance. Source: NJ Uniform Construction Code, subchapter 2, checked November 29, 2026.

Removing finishes and cabinets is different from work that touches load-bearing parts, exits, fire protection or utilities. Ask Construction which scope yours is.

Cost, scope and what to photograph: Interior Demolition.

Cherry Hill permit offices

Construction for demolition permits, Zoning for structures, pools and driveways, and Engineering for sidewalks, curbs and aprons. These are township government numbers. They do not take estimate requests.

Construction Office (township government)
Demolition and construction permits. 820 Mercer Street, Room 205, Cherry Hill, NJ 08002. 856-488-7855
Zoning (Community Development) (township government)
Zoning review of structures, pools, sheds, decks and driveways. 820 Mercer Street, Room 202, Cherry Hill, NJ 08002. 856-488-7870
Engineering (township government)
Right-of-way work: sidewalks, curbs and driveway aprons. 1 Perina Boulevard, Cherry Hill, NJ 08003. 856-424-3203

Who applies and who pays the fees?

We guide you through the permit process. Your written estimate spells out which permits your project needs, who will apply, and what the fees cover.

Permit sources

Six township and state sources. Each rule above links the one it rests on.

Permits in nearby towns

Each town has its own office, and a Cherry Hill rule does not carry over.

Questions about a specific property go to the township offices above. For the planning cost of a pool job, use the Pool Removal Cost Calculator. To request one, use Free Estimate.